







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Boulder City
Boulder City rewards homeowners who plan carefully. Between the historic preservation rules that shape the 89005 core and the long lead times on custom millwork and architectural glass, an addition or ADU here runs on a calendar set months ahead of the first concrete pour. We know that rhythm. We coordinate designers, architects, cabinet makers and glass suppliers around Boulder City’s review process so the schedule holds. Our technicians have up to 11 years of experience, and we scope every job to the tier you choose. Call (833) 516-4965 for a free estimate.
Why Boulder City Homeowners Call Sunrise Manor Construction for Home Additions & ADU

Boulder City is a small town with a building department to match, and that changes how a project gets done. We’ve built our process around it: submittals go in early, allowances are written down, and the price is fixed before any long-lead item is ordered. Homeowners here tell us the coordination is what they value most. One contractor carries the file from design through framing, finish carpentry and final inspection.
Boulder City sits on federal-era ground, and buried utilities along the older streets don’t always match what the drawings show. We treat Bureau of Reclamation-era infrastructure as a known variable, not a surprise. That means utility research and review timelines go into the plan before we talk finishes. Our workmanship warranty and written line-item quotes travel with the job. We answer 24/7, and dispatch runs 7am to 7pm, Sunday through Friday.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Boulder City
ADU Design & Permitting
Design and permitting come first on any Boulder City ADU, and in the 89005 historic core that’s where most of the calendar goes. We coordinate with your architect or designer on elevations and materials that preservation review will accept, and we pull permits with the city. Federal and state review on some parcels stretches the timeline, so we build submittal dates into the schedule from day one.

Garage Conversion ADU
A garage conversion is often the fastest path to an ADU on a Boulder City lot, since you’re working inside an existing shell. Typical conversions here run $30,000 – $80,000, with the spread set by insulation, utilities and finish level. We handle the interior build-out, the mechanical work and the permit file together.

New Detached ADU
A new detached ADU gives you a separate structure, and in Boulder City that means site work, utility runs and desert-grade materials. Prefab and modular systems from Abodu and Dvele can shorten the on-site build, while stick-built gives you more control over detailing that matches the main house. Estimated ADU construction ranges from $90,000 – $220,000 depending on size and spec.

Junior ADU & Interior Conversion
Junior ADUs and interior conversions carve living space out of the existing footprint, which suits the compact Hoover Dam-era bungalows around the historic core. We plan these around the original structure so the new space reads as part of the house, not an addition bolted on. Our home additions & adu team can walk you through the options on your lot.
Trusted Brands We Service in Boulder City
High-end work means high-end components, and we work with 50+ named brand partners so you don’t have to source them yourself. On the ADU side that includes prefab and modular systems from Abodu and Dvele. On finishes it runs across cabinetry, countertops and fixtures at several tiers, so a spec can be luxury or value-conscious and still get the same process. Parts aren’t stocked on any truck; everything is ordered to your project schedule. That’s how we keep the turnaround honest on a Boulder City build.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Boulder City Homes
- Millwork ordered before approval. Cabinetry and architectural glass get fabricated before preservation review clears, then a change order lands when the approved detail differs. We hold orders until the file is approved.
- Utilities treated as routine. Bureau of Reclamation-era infrastructure and federal or state review stretch permits past the draw schedule. We research buried lines early so the plan reflects what’s actually underground.
- Heat and wind on the shell. Concrete pours and roofing scheduled into 100°F+ afternoons compromise cure and finish. We schedule that work for early morning and plan around high-wind days.
- Windows swapped without review. Original single-pane steel casements are prone to wind damage, but replacing them on a historic elevation needs preservation sign-off. We sequence the window scope through review, not around it.
Pricing for Home Additions & ADU in Boulder City, NV

Pricing here is set per job by a written estimate. Typical estimated ranges for Boulder City are below, and the written estimate sets the final price. On the high-end tier, lead times rather than labor drive the schedule, so we lock the price in writing before ordering any long-lead item. That protects you from a change order forced by a millwork delay.
| Scope | Typical Estimated Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves a number within the range: preservation-driven material matching, utility runs, finish tier and the size of the shell. Estimates are free. Call (833) 516-4965.
We Also Serve Cities Near Boulder City
Boulder City sits close to Henderson, Whitney, Paradise and Enterprise, and we work across that stretch of the valley. If you’re just outside the city line, the process is the same: design coordination, permits and a fixed price before ordering. Call us to confirm coverage for your address.
Serving Boulder City, NV – Our Local Coverage Area
We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Boulder City

Because historic preservation review, not construction, sets the calendar when a street-facing elevation changes. Submittals and material matching for 1930s stucco, clay tile and brick happen before a foundation is poured. Call (833) 516-4965 for an exact quote on your addition – estimates are free.
Lead times on custom cabinetry, architectural glass and specialty finishes set the completion date, not labor. Once approval lands, those orders reset the schedule. We sequence scope around submittal dates and lock the price in writing before ordering. Call (833) 516-4965 to talk through your ADU.
Yes. A garage conversion ADU requires a permit, and in the historic core the conversion may also touch preservation review. Our technicians have up to 11 years of experience pulling permits and coordinating that file. Call (833) 516-4965 for a free estimate.
Extreme Mojave heat and high winds push concrete pours and roofing into early morning, and windy days get rescheduled. That can move dates within the build window. We plan the shell work around both from the start. Call (833) 516-4965 for an exact quote.
The fixed price, the scope of work, and the allowances for millwork and specialty finishes all belong in the contract before day one. That’s what prevents a change order when an approved detail differs from what was fabricated. Call (833) 516-4965. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Boulder City projects go smoother when the approval calendar and the material calendar are planned together. We build both into a single written estimate so you know the price and the lead times before anything is ordered. Reach out for a free estimate and let’s map out your addition or ADU. Call (833) 516-4965. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Sunrise Manor Construction.












